This client wanted it all. We designed the system around his specifications and were able to provide everything he wanted (and more) for almost a quarter of what he had received estimates for! Our installers traveled to Florida in March to pull wires and complete the rough-in. We followed up with the final installation 8 months later which took a total of 6 days. When we finished he had one of the most advanced and efficient homes in the country.
Detailed wiring plans were created after the design and estimate were accepted by the client. Each system was diagramed on its own page, making the plans very readable. Custom guides were also created to ensure that no detail was left unanswered.
Mile High Automation sent its installation crew to do the rough-in. All the wiring was pulled and the rough-in was completed in 5 days.
The sheer size of the home and the integration of his 12 subsystems (lighting, climate, irrigation, etc) made the programming of this system both challenging and extremely powerful. Here are some examples of what we did:
A full 6 days8 months after we started the project it finally came time to do the trim-out and final install. We traveled to the home and completed the install in 6 full days. The MHA installer on-site connected a laptop to the system so programmers from the main office could make changes on the fly and test the system in real-time.
After everything was working correctly, we gave the family a walk through of the system and taught them how to use it. After the first 5 minutes the two teenagers were leading the tour.
After the family had lived in the home for a few months they requested the following programming additions/changes. As with all our packages, we completed these free of charge, as we will do for as long as they live in the house.